How Much Sand for Paver Bedding on 300 Sq Ft?

Bedding sand is a thin screeded layer, not a deep fill. This page pre-fills the sand calculator with a 20 × 15 ft (300 ft²) patio and 1 in of sand, and compares 0.75, 1 and 1.5 in.

Sand needed for 300 sq ft bedding (recommended amounts, extra allowance included)
Measure0.75 in deep1 in deep1.5 in deep
Cubic feet20.6327.5041.25
Cubic yards0.761.021.53
Cubic metres0.580.781.17
Weight, short tons1.031.382.06
Weight, tonnes0.941.251.87
Bags: 50 lb425583

At the default 10% extra, 1 in of sand over 300 ft² is 27.5 ft³, about 1.02 yd³ or roughly 1.38 tons at 2,700 lb per cubic yard. Going to 1.5 in raises it to 1.53 yd³; 0.75 in lowers it to 0.76 yd³.

How we got this

300 ft² × (1 ÷ 12 ft) = 25 ft³, plus 10% extra, divided by 27.

Things to check

  • Why 1 in and not 4 in? The bedding layer levels the pavers; the stone base underneath does the structural work. A thick sand layer can shift and settle. Check your paver manufacturer's guidance for the depth.
  • Screed over a firm base. The sand depth is only accurate if the base below is flat and compacted; a bumpy base eats sand.
  • Buy the right sand. Coarse, sharp bedding sand is what installers use; fine play sand compacts differently. Ask your supplier.
  • Order the base too. See the paver base calculator and the deeper fill in the sandbox example.

Estimate only. Results are approximate. Buy 5–10% extra and check quantities with your supplier before you order.